Advanced Planning & Scheduling In Production Company – Navigation System That Helps To Became Lean. The Benefits We Will Achieve: Eliminate 5 wastes of 7 MUDA’s (see Toyota Production System): Eliminate Overproduction Reduce Inventory (Raw material, work in progress and finished goods) Eliminate Waiting (People or parts that wait for a work cycle to be completed) Minimize Transportation (Unnecessary movement of parts between processes) Minimize Movement (Movement of „man“) Reduce everyday long lasting planning routine not in % but in times. Excelerate data collection in shop floor implementing barcode solution based on hand held terminal. Enhance existing ERP system by Production Planning & Scheduling module connected to data collection system in shop floor..